通信人家园

标题: TD基站物理层测量的问题  [查看完整版帖子] [打印本页]

时间:  2011-1-24 22:01
作者: syang8     标题: TD基站物理层测量的问题

TD标准25.225中规定了TD基站所需要的一系列测量,如:RSCP, 时隙ISCP,SIR等共有17项。请问在实际的设计或者商业运用中,有哪些测量是必需实现的,那些是推荐实现的,而哪些则是不必要的?

附所有25.225中的measurment:
RSCP
Timeslot ISCP
Received total wide bandpower
SIR
Transport channel BER
Transmitted carrier power
Transmitted code power
RX Timing Deviation
UTRAN GPS Timing of CellFrames for UE positioning
SFN-SFN observed timedifference
Cell Sync Burst Timing
Cell Sync Burst SIR
Received SYNC-UL TimingDeviation for 1.28Mcps TDD
Angle of Arrival (AOA) for1.28Mcps TDD
HS-SICH reception quality
Transmitted carrier powerof all codes not used for HS-PDSCH, HS-SCCH, E-AGCH, or E-HICH transmission
UpPTSinterference (1.28Mcps TDD)
时间:  2011-1-25 14:06
作者: huzezhong

既然是协议支持的,必然会实现,具体开哪个通过开关控制,看移动要求了~




通信人家园 (https://www.txrjy.com/) Powered by C114