TABLE OF CONTENT
1. COMMISSIONING PREPARATION 3
2. INSPECTINT HARDWARE 3
3. LOGGING INTO THE MML SYSTEM FOR THE FIRST TIME 3
4. CREATE TELNET OR HTTP CONNECTION TO PRINT ALARM 4
5. MONITORING THE UNIT START-UP 4
6. INSPECTING HARDWARE MANAGEMENT SYSTEM 5
7. SETTING THE CALENDAR DATA AND TIME FOR NETWORK ELEMENT 8
8. INTERROGATING EQUIPMENT DATABASE 8
9. INTERROGATING HARDWARE DATA 9
10. INTERROGATING SOFTWARE BUILD INFORMATION 11
11. INSPECTING I/O SYSTEM 11
12. INSPECTING UNIT DIAGNOSITICS AND WORKING STATE 12
13. TESTING A UNIT AFTER REPLACING A PLUG-IN UNIT 13
14. INSPECTING RECOVERY 14
15. INSPECTING SYNCHRONISATION SYSTEM 14
16. CONFIGURING VDS DEVICe 15
17. CHANGE SYSTEM NAME OF NETWORK ELEMENT 16
18. TESTING IP CONNECTIONG FOR NEMU 17
19. TESTING STARTUP OF PMUI AND PLATFORM PROCESSES FOR NEMU 17
20. TESTING ELEMENT MANAGER APPLICATION 18
21. TESTING ELEMENT MANAGER’S MMI WINDOW 18
22. TROUBLE SHOOTING 19