This document provides the method of procedure for the Alcatel-Lucent 9234 Base Station d2U Distributed integration.
1 Introduction 3
2 Product description 3
2.1 Product capabilities 3
2.2 BBU configuration 3
2.3 Connection between BBU and RRH 3
3 Reference 3
4 Software requirement 3
5 License 3
6 Power up 3
6.1 Before power up 3
6.2 BBU Power Up 3
6.3 RRH Power Up 3
6.4 Check CPRI faceplate switches (on BBU) 3
7 Offline RMT Setting 3
7.1 Connection 3
7.2 Select Generic 3
7.3 Check Boot Memory Parameters 3
7.4 Configuring the Remote Radio Head (RRH) 3
7.4.1 Configure CTU 3
7.4.2 RRH EQUIPAGE 3
7.4.3 RRH Sector and Unit id (HD id) 3
7.4.4 Repeat 7.4.3 for all RF head. 3
8 RC/V Setting 3
8.1 CELL2 FORM 3
8.2 CMODEQP FORM 3
8.3 CEQFACE FORM 3
8.4 BTSEQP FORM 3
8.5 FCI FORM 3
8.6 ECP FORM 3
9 DO configuration in OMC-RAN 3
10 Bring the 9234 active 3
11 Adjust TX/RX delay 3
11.1 Run OP:CELL a, ASMB b, RRH c 3
11.2 Calculate the propagation delays for RRH 1 3
11.3 Update ceqface with Tx/Rx delay 3
11.4 Repeat 11.1-11.3 for RRH 2 and RRH 3. 3
11.5 Update Tx Rx delay for EVDO on OMC-RAN for each sector carriers 3
11.6 Repeat 11.5 for RRH2 and RRH3 3
11.7 Stable Clear the cell 3