安装 费 | 施工费 | 机械费 | 仪表费 | 乙材料费 | 技工日 | 普工日 | 综合工日 | 综合单价 | 劳工费 | 净值 |
32695.99 | 21607.31 | 1753.99 | 5702.31 | 3632.38 | 311.95 | 110.70 | 422.65 | 32.5 | 13736.13 | 0.42 |
30595.7 | 21474.55 | 971.12 | 4224.1 | 3925.93 | 289.32 | 163.83 | 453.15 | 32.5 | 14727.38 | 0.48 |
23868.66 | 15535.36 | 937.81 | 3575.21 | 3820.28 | 211.31 | 110.47 | 321.78 | 32.5 | 10457.85 | 0.44 |
17844.95 | 11210.17 | 554.82 | 2655.08 | 3424.88 | 162.23 | 54.95 | 217.18 | 32.5 | 7058.35 | 0.40 |
24432.66 | 14364.19 | 1071.71 | 3489.45 | 5507.31 | 203.56 | 79.71 | 283.27 | 32.5 | 9206.275 | 0.38 |
23822.67 | 15548.40 | 858.25 | 3388.66 | 4027.36 | 216.79 | 98.70 | 315.49 | 32.5 | 10253.43 | 0.43 |
79753.11 | 53783.39 | 3544.38 | 10827.79 | 11597.55 | 753.15 | 380.05 | 1133.20 | 32.5 | 36829 | 0.46 |
31971.03 | 17559.74 | 1444.77 | 4067.96 | 8898.56 | 241.71 | 111.00 | 352.71 | 32.5 | 11463.08 | 0.36 |
19090.73 | 13853.36 | 544.32 | 2003.99 | 2689.06 | 166.97 | 156.81 | 323.78 | 32.5 | 10522.85 | 0.55 |
33821.1 | 21817.94 | 2740.14 | 6352.92 | 2910.1 | 318.28 | 102.92 | 421.20 | 32.5 | 13689 | 0.40 |
27708.01 | 18071.38 | 1768.64 | 4856.23 | 3011.76 | 259.38 | 95.43 | 354.81 | 32.5 | 11531.33 | 0.42 |
46284.15 | 29209.84 | 2749.36 | 7659.39 | 6665.56 | 418.39 | 154.32 | 572.71 | 32.5 | 18613.08 | 0.40 |
31674.31 | 19938.60 | 2141.56 | 5894.33 | 3699.82 | 291.20 | 91.40 | 382.60 | 32.5 | 12434.5 | 0.39 |
33511.73 | 20997.45 | 2301.53 | 6793.60 | 3419.15 | 309.75 | 88.21 | 397.96 | 32.5 | 12933.7 | 0.39 |
20044.17 | 13140.61 | 1459.70 | 4083.87 | 1359.99 | 193.91 | 56.39 | 250.30 | 32.5 | 8134.75 | 0.41 |
56554.22 | 41703.13 | 1616.98 | 8568.89 | 4665.22 | 562.03 | 316.84 | 878.87 | 32.5 | 28563.28 | 0.51 |
34001.3 | 21398.04 | 2173.56 | 6225.32 | 4204.38 | 310.92 | 101.91 | 412.83 | 32.5 | 13416.98 | 0.39 |
18341.29 | 13146.59 | 815.34 | 2999.56 | 1379.80 | 188.83 | 71.68 | 260.51 | 32.5 | 8466.575 | 0.46 |
22389.04 | 13130.18 | 1217.72 | 3282.42 | 4758.72 | 185.47 | 74.19 | 259.66 | 32.5 | 8438.95 | 0.38 |
47139.14 | 26655.30 | 1132.95 | 4261.75 | 15089.14 | 345.74 | 220.79 | 566.53 | 32.5 | 18412.23 | 0.39 |
655543.96 | 424145.53 | 31798.65 | 100912.83 | 98686.95 | 5940.89 | 2640.3 | 8581.19 | 32.5 | 278888.7 | |
100.0% | 64.7% | 4.9% | 15.4% | 15.1% | 1.00 | 0.444 | 42.25% |
投资(万元) | 费 用 名 | 分 配 | 总工日/41.43 | 技工 | 普通 |
1500.00 | 施工费64.6% | 969.00 | |||
机械费4.9% | 73.50 | ||||
仪表费15.4% | 231.00 | ||||
采购材料15.1% | 226.50 | ||||
总工日/41.43 | 23,3888.00 | 13,0041.00 | 10,3846.00 |