| 1,Description: | ||||
| XXXXX O01_BBU01 NR Cell Unavailable ,NR DU Cell TRP Unavailable, AAU2 link faulty. | ||||
| Red light on board UBBPg2a( interface01, Slo5 of BBU) | ||||
| 2,Alarm PIC: | ||||
| As showedn in Sheet "PIC" | ||||
| 3, Prior Analysis: | ||||
3.1 | Xn interface Faulty | |||
| X2 interface Faulty | ||||
| This arlarm normally dut to configuration of neibour cell | ||||
| it should be debugged on the background,not SE' duty. | ||||
3.2 | DU cell TRP unavaliable | |||
| This arlarm normally dut to software version update. | ||||
| it should be debugged on the background,not SE' duty. | ||||
3.3 | RU Unit CPRI interface Error | |||
| Red light on board UBBPg2a( interface01, Slo5 of BBU) | ||||
| it is SE' duty to test. | ||||
| 4,Preparation: | ||||
| Tools: | Multimeter | |||
| Optical power meter if can | ||||
| Laptop | ||||
| Cellphone with camera | ||||
| Safety suits and protective tools | ||||
| Tools box inludeing wrenchs, screwdrivers,and so on. | ||||
| Spare: | ||||
| SFP if can | ||||
| CPRI if can | ||||
| UBBPg2a if can | ||||
| Accessories including Waterproof mastic,Waterproof tape,Electrostatic discharge tape,copper lugs and so on. | ||||
| 5, Switch Test | ||||
5.1 | Points for attention | |||
| The principle of switching test is due to elimination method | ||||
| Each time only switch one component.By test, we can tell if the component ok. | ||||
| And in order to prove that action is always right, we should take a picture after every check. | ||||
| Because we have identified that it is link or AAU or interface problem, so we just check link light in switch test. | ||||
| For cell working well or not, we don't care it in testing. | ||||
5.2 | The objects will be tested | |||
| Power of AAU--AAU is a precision device, so it is very sensitive to voltage | ||||
| SFP on board UBBPg2a( interface01, Slo5 of BBU) | ||||
| SFP of AAU2 | ||||
| CPRI of AAU link | ||||
| the interface 01 of board UBBPg2a( Slo5 of BBU) | ||||
| AAU5645 | ||||
| Confustion 1: | ||||
| AAU on site, but in my list, there should be RRU. | ||||
5.3 | The process | In test, pls note SN codes of all tested emothion. | ||
| 5.3.1 | Take pic | |||
| take a photo on BBU panel | ||||
| Take a photo on board UBBPg2a( interface01, Slo5 of BBU) | ||||
| Take a photo on board UBBPg2a( interface01, Slo4 of BBU) | ||||
| take a photo on AAU2 type label | ||||
| take a photo on AAU2 light | ||||
| 5.3.2 | Power Checking | |||
| Firstly ,checking the power of output to AAU2 from DCDP in cabnet.Take a PIC pls. | ||||
| Secondly checking the power of input to AAU2 on the tower or manpole.Take a PIC of AAU2 lights pls. | ||||
| Remark: | Loose joints can easily cause problems or burn out of the equipmen | |||
| 5.3.3 | SFP of BBU checking | |||
| In switch test, we want to find the broken part. | ||||
| So please just change the part to be tested to another good cell link. | ||||
| Because there may be damage to multiple parts, every part needs to be switch tested. | ||||
| Certenly, when all parts have been tested, we can move good part to broken AAU2 link for confirmation. | ||||
| Pls apply permission from NOC, firstly. | ||||
| 5.3.2.1 | Move SFP on board UBBPg2a( interface01, Slo5 of BBU) to other good cell link. | |||
| if the good cell link still up, the tested SFP is good. | ||||
| Otherwise, the tested SFP is fault. | ||||
| pls take a PIC for this to show light status. | ||||
| Return to the replaced unit to restore the original good link to normal | ||||
| Make sure the link light back green. | ||||
| 5.3.2.2 | If there is SFP on board UBBPg2a( interface01, Slo4 of BBU) also, pls repeat 5.3.2.1 steps. | |||
| Ps: sometime AAU can take two CPRI . | ||||
| 5.3.4 | SFP of AAU2 Checking | |||
| Move tested SFP to other good cell link .pls repeat 5.3.2.1 steps. | ||||
| Ps: sometime AAU can take two SFP,pls do switch test one by one. Do not do two switch test at same time , pls. | ||||
| 5.3.5 | CPRI of AAU Checking | |||
| Move tested CPRI to other good cell link .pls repeat 5.3.2.1 steps. | ||||
| Ps: sometime AAU can take two CPRI,pls do switch test one by one. Do not do two switch test at same time , pls. | ||||
| 5.3.6 | the interface 01 of board UBBPg2a( Slo5 of BBU) Checking | |||
| Move other good cell link to this interface.pls repeat 5.3.2.1 steps. | ||||
| 5.3.7 | If there is link to the interface 01 of board UBBPg2a( Slo4 of BBU), pls do this Checking | |||
| Move other good cell link to this interface.pls repeat 5.3.2.1 steps. | ||||
| 5.3.8 | AAU2(AAU5645) checking | |||
| Move other good cell link to AAU2 , pls repeat 5.3.2.1 steps. | ||||
| 5.3.9 | Confirmation | |||
| Certenly, when all parts have been tested, we can move good part to broken AAU2 link for confirmation. | ||||
| If you think it not necessary, this step can be ignored. | ||||
| 6, Apply spare | ||||
| If manager ask, pls put all PIC in sheet "PIC" in this test report, | ||||
| If manager is nice people, just show related PIC to him. | ||||
| Write down SN code and hardware type, send it to manager . Then spare will be prepared in a few days. | ||||
| Work is done, thank you for efforts. | ||||
| 通信人家园 (https://www.txrjy.com/) | Powered by C114 |