1,Description: | | | |
| XXXXX O01_BBU01 NR Cell Unavailable ,NR DU Cell TRP Unavailable, AAU2 link faulty. |
| Red light on board UBBPg2a( interface01, Slo5 of BBU) |
| | | | |
| | | | |
| | | | |
2,Alarm PIC: | | | |
| As showedn in Sheet "PIC" | |
| | | | |
| | | | |
3, Prior Analysis: | | |
| 3.1 | Xn interface Faulty |
| | X2 interface Faulty |
| | This arlarm normally dut to configuration of neibour cell |
| | it should be debugged on the background,not SE' duty. | | |
| | | | |
| 3.2 | DU cell TRP unavaliable |
| | This arlarm normally dut to software version update. |
| | it should be debugged on the background,not SE' duty. | | |
| | | | |
| 3.3 | RU Unit CPRI interface Error |
| | Red light on board UBBPg2a( interface01, Slo5 of BBU) |
| | it is SE' duty to test. | | |
| | | | |
4,Preparation: | | | |
| Tools: | Multimeter | |
| | Optical power meter if can |
| | Laptop | | |
| | Cellphone with camera |
| | Safety suits and protective tools |
| | Tools box inludeing wrenchs, screwdrivers,and so on. |
| Spare: | | | |
| | SFP if can | |
| | CPRI if can | |
| | UBBPg2a if can | |
| | Accessories including Waterproof mastic,Waterproof tape,Electrostatic discharge tape,copper lugs and so on. |
| | | | |
5, Switch Test | | | |
| | | | |
| 5.1 | Points for attention |
| | The principle of switching test is due to elimination method |
| | Each time only switch one component.By test, we can tell if the component ok. |
| | And in order to prove that action is always right, we should take a picture after every check. |
| | Because we have identified that it is link or AAU or interface problem, so we just check link light in switch test. |
| | For cell working well or not, we don't care it in testing. |
| | | | |
| 5.2 | The objects will be tested |
| | Power of AAU--AAU is a precision device, so it is very sensitive to voltage |
| | SFP on board UBBPg2a( interface01, Slo5 of BBU) |
| | SFP of AAU2 | |
| | CPRI of AAU link | |
| | the interface 01 of board UBBPg2a( Slo5 of BBU) |
| | AAU5645 | | |
| | | | |
| | Confustion 1: | |
| | | AAU on site, but in my list, there should be RRU. | |
| | | | |
| | | | |
| 5.3 | The process | In test, pls note SN codes of all tested emothion. |
| | | | |
| | 5.3.1 | Take pic | |
| | | take a photo on BBU panel |
| | | Take a photo on board UBBPg2a( interface01, Slo5 of BBU) |
| | | Take a photo on board UBBPg2a( interface01, Slo4 of BBU) |
| | | take a photo on AAU2 type label |
| | | take a photo on AAU2 light |
| | | | |
| | | | |
| | | | |
| | | | |
| | 5.3.2 | Power Checking |
| | | Firstly ,checking the power of output to AAU2 from DCDP in cabnet.Take a PIC pls. |
| | | Secondly checking the power of input to AAU2 on the tower or manpole.Take a PIC of AAU2 lights pls. |
| | | | |
| | | Remark: | Loose joints can easily cause problems or burn out of the equipmen |
| | | | |
| | 5.3.3 | SFP of BBU checking |
| | | In switch test, we want to find the broken part. |
| | | So please just change the part to be tested to another good cell link. |
| | | Because there may be damage to multiple parts, every part needs to be switch tested. |
| | | Certenly, when all parts have been tested, we can move good part to broken AAU2 link for confirmation. |
| | | | |
| | | Pls apply permission from NOC, firstly. |
| | | | |
| | | 5.3.2.1 | Move SFP on board UBBPg2a( interface01, Slo5 of BBU) to other good cell link. |
| | | | if the good cell link still up, the tested SFP is good. |
| | | | Otherwise, the tested SFP is fault. |
| | | | pls take a PIC for this to show light status. |
| | | | Return to the replaced unit to restore the original good link to normal |
| | | | Make sure the link light back green. |
| | | | |
| | | 5.3.2.2 | If there is SFP on board UBBPg2a( interface01, Slo4 of BBU) also, pls repeat 5.3.2.1 steps. |
| | | | Ps: sometime AAU can take two CPRI . |
| | | | |
| | 5.3.4 | SFP of AAU2 Checking |
| | | | |
| | | Move tested SFP to other good cell link .pls repeat 5.3.2.1 steps. |
| | | Ps: sometime AAU can take two SFP,pls do switch test one by one. Do not do two switch test at same time , pls. |
| | | | |
| | 5.3.5 | CPRI of AAU Checking |
| | | Move tested CPRI to other good cell link .pls repeat 5.3.2.1 steps. |
| | | Ps: sometime AAU can take two CPRI,pls do switch test one by one. Do not do two switch test at same time , pls. |
| | | | |
| | 5.3.6 | the interface 01 of board UBBPg2a( Slo5 of BBU) Checking |
| | | Move other good cell link to this interface.pls repeat 5.3.2.1 steps. |
| | | | |
| | 5.3.7 | If there is link to the interface 01 of board UBBPg2a( Slo4 of BBU), pls do this Checking |
| | | Move other good cell link to this interface.pls repeat 5.3.2.1 steps. |
| | | | |
| | 5.3.8 | AAU2(AAU5645) checking |
| | | Move other good cell link to AAU2 , pls repeat 5.3.2.1 steps. |
| | | | |
| | 5.3.9 | Confirmation |
| | | Certenly, when all parts have been tested, we can move good part to broken AAU2 link for confirmation. |
| | | If you think it not necessary, this step can be ignored. |
| | | | |
6, Apply spare | | | |
| | If manager ask, pls put all PIC in sheet "PIC" in this test report, |
| | If manager is nice people, just show related PIC to him. |
| | | | |
| | Write down SN code and hardware type, send it to manager . Then spare will be prepared in a few days. |
| | | | |
| | | | |
| Work is done, thank you for efforts. |