MGW R4 COMMISSIONING
Version 1.0
10.19.2005

TABLE OF CONTENT
1.        COMMISSIONING PREPARATION        3
2.        INSPECTINT HARDWARE        3
3.        LOGGING INTO THE MML SYSTEM FOR THE FIRST TIME        3
4.        CREATE TELNET OR HTTP CONNECTION TO PRINT ALARM        4
5.        MONITORING THE UNIT START-UP        4
6.        INSPECTING HARDWARE MANAGEMENT SYSTEM        5
7.        SETTING THE CALENDAR DATA AND TIME FOR NETWORK ELEMENT        8
8.        INTERROGATING EQUIPMENT DATABASE        8
9.        INTERROGATING HARDWARE DATA        9
10.        INTERROGATING SOFTWARE BUILD INFORMATION        11
11.        INSPECTING I/O SYSTEM        11
12.        INSPECTING UNIT DIAGNOSITICS AND WORKING STATE        12
13.        TESTING A UNIT AFTER REPLACING A PLUG-IN UNIT        13
14.        INSPECTING RECOVERY        14
15.        INSPECTING SYNCHRONISATION SYSTEM        14
16.        CONFIGURING VDS DEVICe        15
17.        CHANGE SYSTEM NAME OF NETWORK ELEMENT        16
18.        TESTING IP CONNECTIONG FOR NEMU        17
19.        TESTING STARTUP OF PMUI AND PLATFORM PROCESSES FOR NEMU        17
20.        TESTING ELEMENT MANAGER APPLICATION        18
21.        TESTING ELEMENT MANAGER’S MMI WINDOW        18
22.        TROUBLE SHOOTING        19

举报本楼

本帖有 3 个回帖,您需要登录后才能浏览 登录 | 注册
您需要登录后才可以回帖 登录 | 注册 |

版规|手机版|C114 ( 沪ICP备12002291号-1 )|联系我们 |网站地图  

GMT+8, 2025-8-8 19:37 , Processed in 0.103433 second(s), 19 queries , Gzip On.

Copyright © 1999-2025 C114 All Rights Reserved

Discuz Licensed

回顶部