通信人家园

 找回密码
 注册

只需一步,快速开始

短信验证,便捷登录

搜索

军衔等级:

  新兵

注册:2009-5-5
跳转到指定楼层
1#
发表于 2017-2-8 10:37:47 |只看该作者 |倒序浏览
个人求职
学历要求: 本科
所在地区: 上海 » 不限
性别:
工作经验: 八年以上
本帖最后由 zhengrye 于 2017-2-8 16:50 编辑

Name                              Ye Zhengrong    Mobile                                  150-0062-4650  
Email                                       yzrbj2008@hotmail.com
Specialty
l 4 years in the firewall testing, NAT policy, VPN,SSL-VPN,DPI-SSL, Access Rules, CFS, GAV, Application Firewall, IPS...
l 4+ years, experience in and knowledge ofEthernet data and Layer 2 switch related features and standards Such as
l 802.1D/802.1Q/802.1AD,STP/RSTP/MSTP,QOS, LAG, G.8032,G.8031
l Rich experience in Test Equipment operation: TestCenter, IXIA, Anritsu 1230B, SmartBit, ANT-5
l GoodEnglish ability including listening, reading, writing, and speaking
WorkExperience
11/2012– now             Dell SonicWall, FunctionQA department, QA Test Engineer
07/2010– 10/2012      Nokia Siemens Netowork, MWRdepartment, System Test Engineer
09/2008– 06/2010      Shanghai Bell – Alcatel, OPDdepartment, System Test Engineer
ProjectExperience
10/2012-now        Dell SonicWallNSA/TZ series firewall test, including NAT policy, VPN, SSL-VPN,VPN,DPI-SSL,Access Rules, CFS, GAV, Application Firewall, IPS, Geo-IP, Botnet. Do the quicksmoke test and function test then update the test result in the test DB.  Filethe DTS to trace the bug.  Verify andclose DTS filed by QA/Tech Support/Customer/SE. Do the upgrade test while themainly release was done.
08/2012-10/2012      FlexiPacket Radio Rel1.4, responsible for the QoS testing of ODU. Validate the Classifier,Queue, and Scheduling. Work with SPL and SW to make the test schedule, preparethe test case from the test database and FuncSpec, guarantee the Quality of theproduct, create Fault Report to trace the issue, do the regression testing of theissues on the new load.
08/2010-09/2011           First Mile 200 Rel.1.0EP1, responsible for thetesting of the R/MSTP and LAG protocol. Submit the Fault Report to trace thebug and verify it on the new load, deliver the Switching Time test report tothe SPL.
10/2011-02/2012           IOT test. Inter-working operation test with different IDUand ODU under different topology such as Ring, Double Ring, Tree……to verify thebasic features, like E-Line, E-LAN, xSTP, Timing, G.8031, G.8032, CESoPProtection were working fine or not, deliver the report for each test topology.
Education
09/2004 - 07/2008     ShenyangJianzhu University, Computer Science and Technology, Bachelor Degree

Hobby                            Poker

举报本楼

本帖有 3 个回帖,您需要登录后才能浏览 登录 | 注册
您需要登录后才可以回帖 登录 | 注册 |

版规|手机版|C114 ( 沪ICP备12002291号-1 )|联系我们 |网站地图  

GMT+8, 2025-7-19 10:21 , Processed in 0.165237 second(s), 20 queries , Gzip On.

Copyright © 1999-2025 C114 All Rights Reserved

Discuz Licensed

回顶部